Prof Obuchi and Toshi went to the fabrication shop in Toyohashi near Toyota Motor factory to review the progress on the fabrication process of our pavilion’s components. In collaboration with Tsukasa Takenaka of AnS Studio, the components have been developed in order to be fabricated by the Kuka’s robotic arm attached with a laser cutter and welder. Once welding is done, the component was inflated by a hydraulic pump.
Advanced Design Studies Blog: Critical Mass
Be First to Comment