STIK Project – Obuchi Lab

A few photos from our daily life at Obuchi Lab~

The lab before a wild pack of students messed it up with glue and chopsticks. 

Beautiful autumn day at the university

Not only a home for us but also a space enjoyed by all; may it be the children playing around or the elderly coming to draw and paint, the university is always lively with people. 
Our 1:1 mock up of one of the walls of the pavilion. Yes it can stand by itself. Unbelievable I know. Just look at that cantilever!
Construction has recently begun outside for the pavilion. Work is being undertaken down to the millimetre to assure complete success of this project. 

Can’t wait to see it completed! 
First base layer has been set. Anyone else is getting excited?


Will it STIK? Part 1 – Curvature

A look at the aggregation programming & simulation behind STIK

Initial simulations were run to determine maximum curvature achievable with the STIK system. Alteration of the dispensing angle, velocity, friction and adhesion were calculated in order to provide maximum cantilever.
Curvature test 2b

Curvature test 7c

Curvature test 1c

Curvature test 7a

Curvature test 7b


Pavilion’s Construction On-site

The construction of our Pavilion is starting on site. After a week of working on the footings, yesterday we began pouring the first chopsticks. 
Concrete footings on site. 

Pouring chopsticks.

1/8 part of the footprint has been poured with 15.000 chopsticks

STIK – 2014 Digital Fabrication Lab Research Pavilion

It’s been a while since we have posted here on our blog.

In the past 9 months, we have been busy developing our new design proposal for this year’s pavilion project which was developed in collaboration with Shimizu Corporation, one of Japan’s major construction company. In the coming days, we will upload images of our current activities and the past events.

Stay tuned.